BTS DATA COMPLETE THROUGH JUNE 2026HISTORICAL ODDS · NOT LIVE FLIGHT STATUS
DelayOddsKnow the route before you book
SRQ→IND

Sarasota/Bradenton, FL (SRQ) to Indianapolis, IN (IND) flight delay odds

71.6% of 363 official scheduled SRQ-to-IND flights arrived on time; 20.7% arrived at least 30 minutes late and 0.6% were cancelled during July 2025–June 2026.

Source: U.S. Bureau of Transportation Statistics · Reporting window: July 2025–June 2026 · Updated September 16, 2026

HISTORICAL ROUTE SIGNALGenerally reliable
71.6%arrived on time
20.7%30+ min late
0.6%cancelled
363scheduled flights
Based on July 2025–June 2026; on time means arrival less than 15 minutes late.
60+ minutes late11.8%all scheduled flights
120+ minutes late5.2%all scheduled flights
Diverted0.0%did not reach as scheduled
Average arrival+13.8 mincompleted flights

Which departure time was most reliable for SRQ to IND?

Among qualifying SRQ-to-IND departure window results, Early morning had the highest on-time rate: 91.7% of 48 flights. Evening was lowest at 53.8% across 52 flights.

Departure windowFlightsOn time30+ minCancelled
Early morning4891.7%4.2%2.1%
Late morning7482.4%12.2%1.4%
Afternoon18067.2%22.8%0.0%
Evening5253.8%40.4%0.0%

Which weekday was most reliable for SRQ to IND?

Among qualifying SRQ-to-IND weekday results, Friday had the highest on-time rate: 74.3% of 74 flights. Sunday was lowest at 59.5% across 42 flights.

DayFlightsOn time30+ minCancelled
Monday7265.3%25.0%1.4%
Friday7474.3%14.9%0.0%
Saturday11871.2%22.9%0.0%
Sunday4259.5%31.0%0.0%

Which airline was most reliable for SRQ to IND?

Among qualifying SRQ-to-IND airline results, Southwest Airlines had the highest on-time rate: 72.0% of 182 flights. Allegiant Air was lowest at 71.3% across 181 flights.

AirlineFlightsOn time30+ minCancelled
Southwest Airlines18272.0%19.8%0.5%
Allegiant Air18171.3%21.5%0.6%

Which month was most reliable for SRQ to IND?

Among qualifying SRQ-to-IND month results, June 2026 had the highest on-time rate: 88.2% of 17 flights. December 2025 was lowest at 50.0% across 42 flights.

MonthFlightsOn time30+ minCancelled
July 20252979.3%13.8%0.0%
August 20251770.6%23.5%0.0%
October 20254479.5%11.4%0.0%
November 20253378.8%12.1%0.0%
December 20254250.0%42.9%0.0%
January 20262665.4%23.1%3.8%
February 20263375.8%12.1%0.0%
March 20266061.7%30.0%1.7%
April 20262777.8%18.5%0.0%
May 20262176.2%14.3%0.0%
June 20261788.2%11.8%0.0%

What drove SRQ to IND delay minutes?

Late aircraft was the largest recorded SRQ-to-IND delay category, accounting for 61.9% of 7,355 BTS-attributed delay minutes during July 2025–June 2026.

Airline21.0%
Late aircraft61.9%
National airspace15.2%
Weather1.4%
Security0.4%
This is historical evidence, not a forecast.

Weather, schedules and operations change. For a trip you have already booked, use the airline or airport for live status.